London 2012 Temporary Shooting Venue

Holmes Miller was the Architectural Consultant of the External Technical Review (ETR) team for the provision of technical review and supervisor framework. The general requirements of the ETR team are to:
• Review the design in terms of Technical Correctness and consistency with ODA requirements.
• Provide ODA with technical support during construction.
• Aid in the mitigation of risk.

The purpose of the Supervisor:
• To act as the Employer’s Site Quality Assurance Representative
• To verify contractors compliance with self certification.
• To ensure verifications of the works
• Compliance with NEC Contract.

Client

Olympic Delivery Authority

Location

London

Completed

2012

Cost

£20m